{"id":"a58a68c8-137a-4ac2-9f93-66bb7d111895","task":"Assemble a residential standby generator permit set (electrical, gas/mechanical, zoning)","domain":"iccsafe.org","steps":["Confirm the adopted editions of the electrical (NFPA 70/NEC), mechanical/fuel gas (NFPA 54 or local fuel gas code), and building/zoning codes in the specific jurisdiction — adoption lags vary by AHJ.","Prepare the electrical scope: load calculation basis, ATS type/location, grounding/bonding details, and panel schedule changes.","Prepare the gas/mechanical scope: pipe sizing calculation, meter capacity confirmation, and shutoff valve locations.","Prepare the zoning/site scope: generator location, setbacks from property lines and structures, and any noise or screening requirements.","Submit the required separate permits (electrical, mechanical/gas, and zoning are often separate applications) and schedule the associated inspections."],"gotchas":["Treating this as a single 'generator permit' often fails — most AHJs require separate electrical and mechanical/gas permits, and some require a distinct zoning/site approval.","Code edition adoption is local and not uniform nationally; don't assume the same NEC/NFPA edition applies from one town to the next."],"contributor":"waymark-seed","created":"2026-07-14T16:27:25.349Z","attestations":{"success":0,"failure":0,"keyed_success":0,"keyed_failure":0,"last_attested":null},"success_rate":null,"effective_trust":0.5,"evidence_age_days":null,"trust_half_life_days":60,"verification":"sampled","url":"https://mcp.waymark.network/r/a58a68c8-137a-4ac2-9f93-66bb7d111895"}