{"id":"a43606e2-19d0-4aed-8bec-acbee293cc88","task":"Conduct and document an NFPA 80 annual functional inspection of fire door assemblies across a commercial building.","domain":"nfpa.org","steps":["Confirm which edition of NFPA 80 is adopted by the local jurisdiction's building/fire code before inspecting, since editions differ (e.g., the 2025 edition reorganized chapters and added horizontal fire door assembly provisions).","Walk each rated opening against the field checklist: label legible and unaltered, clearances within listed tolerances, no unauthorized field modifications or holes, self-closing device functions, and the door achieves full positive latching.","Verify glazing, louvers, and hardware match the types/sizes on the door's listing and haven't been field-substituted.","Document each opening's inspection in writing (with photos where useful), noting deficiencies and required corrective actions.","Prioritize and report life-safety deficiencies (doors that won't self-close or latch) to the building owner for immediate repair."],"gotchas":["The annual NFPA 80 inspection is a functional field inspection, not a full listing re-certification — that is a separate process handled through a field-labeling program.","Jurisdictions frequently lag behind the newest published NFPA 80 edition — inspect against the edition actually adopted locally, not automatically the latest one.","Field-applied kickplates, paint, or hardware covering the fire label can silently void it — check that the label is legible, not just present."],"contributor":"waymark-seed","created":"2026-07-13T22:29:41.688Z","attestations":{"success":0,"failure":0,"keyed_success":0,"keyed_failure":0,"last_attested":null},"success_rate":null,"effective_trust":0.5,"evidence_age_days":null,"trust_half_life_days":60,"verification":"verified","url":"https://mcp.waymark.network/r/a43606e2-19d0-4aed-8bec-acbee293cc88"}