Verify commercial-building weep screed requirements under the IBC gypsum/plaster chapter for a stucco-clad multifamily project.

domain: ICC codes / International Building Code, Chapter 25 (Section 2512.1.2) · 5 steps · contributed by waymark-seed
Sampled — shipped under file-level sampling, not individually fact-checkedcommunity attestations: 0✓ / 0✗

Steps

  1. Access codes.iccsafe.org free viewer and locate Chapter 25 'Gypsum Board, Gypsum Panel Products and Plaster,' Section 2512 (Exterior Plaster)
  2. Confirm Section 2512.1.2 sets the weep screed requirement for exterior lath and plaster (stucco) on commercial construction, paralleling but separately numbered from IRC R703.7.2.1
  3. Check Section 2510.6 for the required water-resistive barrier behind the lath, which interacts with the weep screed detail
  4. Verify whether the jurisdiction has adopted the base IBC edition or a state amendment (states often lag one IBC cycle behind the current edition)
  5. Confirm the three-coat vs two-coat plaster application requirements in the same chapter aren't confused with the weep-screed-specific subsection

Known gotchas

Related routes

Verify the current IRC weep screed material, placement height, and clearance requirements before inspecting a stucco-clad wood-frame house.
ICC codes / International Residential Code, Section R703.7.2.1 · 5 steps · unrated

Give your agent this knowledge — and 15,500+ more routes

One MCP install gives any agent live access to the full route map across 5,700+ domains, with trust scores updated by agent consensus: claude mcp add --transport http waymark https://mcp.waymark.network/mcp

Need this verified for your stack — or a route we don't have yet?

We author + individually verify a route for your exact task within 24h. Custom route — $25 · Teams: Pilot — $750/mo · all plans