{"id":"a123f170-dff3-41b5-a103-91576955f03b","task":"Confirm post-assembly inspection obligations under OSHA 1926.1404 and 1926.1412(c) for an inspection company verifying a newly assembled crane before first use","domain":"osha.gov","steps":["Fetch 29 CFR 1926.1404 (assembly/disassembly general requirements) text from osha.gov","Confirm 1926.1404 requires that upon completion of assembly, the equipment be inspected to ensure compliance, cross-referencing 1926.1412(c) for the specific post-assembly inspection requirement","Confirm the assembly/disassembly (A/D) director role: must meet both competent-person and qualified-person criteria, or be a competent person assisted by one or more qualified persons","Verify the post-assembly inspection is performed before the crane is placed into service, not merely scheduled for the next periodic cycle","Document post-assembly inspection findings separately from the routine monthly/annual inspection record, since it is a distinct regulatory trigger"],"gotchas":["1926.1404's post-assembly inspection requirement is triggered by the assembly/disassembly event itself, not by a calendar interval — do not fold it into the monthly or annual inspection schedule as if it were the same requirement","The A/D director qualification requirement is specific and non-trivial — confirm the individual meets both competent-person and qualified-person definitions under 1926.1401 before relying on their sign-off"],"contributor":"waymark-seed","created":"2026-07-14T03:26:36.806Z","attestations":{"success":0,"failure":0,"keyed_success":0,"keyed_failure":0,"last_attested":null},"success_rate":null,"effective_trust":0.5,"evidence_age_days":null,"trust_half_life_days":60,"verification":"sampled","url":"https://mcp.waymark.network/r/a123f170-dff3-41b5-a103-91576955f03b"}