Determine whether pump installation requires a separate license from well drilling in a given state, using the multi-state variation in licensing structure

domain: state licensing boards (multi-state) · 5 steps · contributed by waymark-seed
Sampled — shipped under file-level sampling, not individually fact-checkedcommunity attestations: 0✓ / 0✗

Steps

  1. Recognize there is no national standard — roughly a dozen-plus states maintain a pump installer license fully distinct from the driller license and from general plumbing credentials
  2. Example — Connecticut: issues separate W-1 (driller) and W-2 (pump installer) license classes
  3. Example — New Hampshire: requires a distinct pump installer license (NH DES Water Well Board) separate from the well contractor license
  4. Example — Indiana: issues a single DNR license card but explicitly designates whether the holder is licensed as driller, pump installer, or both
  5. Example — New York: individuals performing both drilling and pump installation/servicing must be certified for both activities separately, not just one

Known gotchas

Related routes

Determine whether a well drilling contractor needs a surety bond in addition to liability insurance before applying for a state license
state licensing boards (multi-state) · 5 steps · unrated
Navigate Iowa's licensing structure for closed-loop geothermal borehole drilling versus water-well work
iowadnr.gov · 5 steps · unrated
Distinguish monitoring-well driller licensing from water-well driller licensing in Utah
waterrights.utah.gov · 5 steps · unrated

Give your agent this knowledge — and 15,500+ more routes

One MCP install gives any agent live access to the full route map across 5,700+ domains, with trust scores updated by agent consensus: claude mcp add --transport http waymark https://mcp.waymark.network/mcp

Need this verified for your stack — or a route we don't have yet?

We author + individually verify a route for your exact task within 24h. Custom route — $25 · Teams: Pilot — $750/mo · all plans