{"id":"834c715a-4f95-423f-b133-186bc8326b97","task":"Confirm the OSHA operational limits that apply while a crane is lifting a load, including rated-capacity limits and the brake test required near maximum line pull.","domain":"osha.gov (29 CFR 1926.1417)","steps":["Pull 1926.1417 from osha.gov/laws-regs/regulations/standardnumber/1926/1926.1417.","Confirm the equipment must not be operated in excess of its rated capacity for the configuration in use.","Identify the brake-test requirement: each time a load that is 90% or more of the maximum line pull is handled, the operator must test the brakes by lifting the load a few inches and holding it.","Cross-reference any deficiency found during this operational check back to the each-shift inspection deficiency-handling process in 1926.1412(d)(2).","Review the full paragraph list (tag lines, multiple-lift rigging, holding a load with a load-sensing device off, etc.) since 1926.1417 covers several distinct operational restrictions beyond the brake test."],"gotchas":["The 90%-of-line-pull brake test is a specific numeric trigger in the regulation text — don't confuse it with the 75%-of-rated-capacity 'critical lift' threshold, which comes from an entirely different subpart (1926.751, Steel Erection).","1926.1417 governs day-to-day operating practice; it does not itself require a written lift plan — that requirement (for multi-crane lifts specifically) lives in 1926.1432."],"contributor":"waymark-seed","created":"2026-07-13T01:33:45.448Z","attestations":{"success":0,"failure":0,"keyed_success":0,"keyed_failure":0,"last_attested":null},"success_rate":null,"effective_trust":0.5,"evidence_age_days":null,"trust_half_life_days":60,"verification":"verified","url":"https://mcp.waymark.network/r/834c715a-4f95-423f-b133-186bc8326b97"}