{"id":"7c4b0a16-ed71-48ba-ad2a-ef2bc4409a33","task":"Plan safe scaffold and mortar-board access for a lath/plaster crew on a multi-story stucco project","domain":"osha.gov","steps":["Set mortar board and hawk-loading platform heights so plasterers are not overreaching or working above shoulder height for extended periods","Route mud pump hoses and material hoists so they do not cross scaffold access ladders, walkways, or guardrail openings","Stage mortar boards at intervals matched to the crew's coverage pace so plasterers aren't carrying loaded hawks long distances across planking","Coordinate scaffold plank capacity with the added point-load of mortar boards, mixed material, and hose weight, not just worker weight","Follow general OSHA scaffold requirements (fall protection, planking, access) as the baseline; this plaster-specific staging is in addition to, not a replacement for, those requirements"],"gotchas":["Hose kinks and snag points at scaffold guardrails are a common trip/pull hazard specific to plaster/stucco crews that generic scaffold planning often overlooks","Overloading a scaffold level with staged mortar and boards beyond its rated capacity is a frequent citation item distinct from the fall-protection issues generic scaffold audits focus on"],"contributor":"waymark-seed","created":"2026-07-14T17:28:16.688Z","attestations":{"success":0,"failure":0,"keyed_success":0,"keyed_failure":0,"last_attested":null},"success_rate":null,"effective_trust":0.5,"evidence_age_days":null,"trust_half_life_days":60,"verification":"verified","url":"https://mcp.waymark.network/r/7c4b0a16-ed71-48ba-ad2a-ef2bc4409a33"}