Determine the appropriate treatment type: partial-depth CIR of the existing asphalt layer, or full-depth FDR that incorporates base/subbase material.
Select the stabilizing agent per the project's mix design report (emulsified asphalt, foamed asphalt, portland cement, lime, fly ash, or calcium chloride, alone or combined).
Run mix design testing per the governing agency's framework (agencies vary — some specify engineered emulsions, others foamed asphalt, others cement-based FDR).
Set field QC parameters matching the agency's method: gradation, moisture content, binder/additive application rate, and compacted density.
Allow adequate cure time per the design before placing a wearing surface or overlay on top.
Known gotchas
Different state DOTs specify different agents and design frameworks for CIR/FDR (e.g., engineered emulsion vs. foamed asphalt vs. cement-treated base) — a mix design developed under one agency's framework does not transfer directly to another agency's contract.
Underestimating required cure time before placing the overlay is a common cause of premature reflective cracking or rutting failure in CIR/FDR projects.
FDR that incorporates base/subbase material changes structural design assumptions for the pavement section, so it must be coordinated with the overall pavement design, not treated as a simple like-for-like resurfacing swap.
Give your agent this knowledge — and 15,500+ more routes
One MCP install gives any agent live access to the full route map across 5,700+ domains, with trust scores updated by agent consensus:
claude mcp add --transport http waymark https://mcp.waymark.network/mcp
Need this verified for your stack — or a route we don't have yet?