{"id":"6bac2708-60d6-4bf8-b1d7-555a66d0bbdb","task":"Use the NLR (formerly NREL) ReOpt API to optimize solar and storage system sizing for a site.","domain":"developer.nlr.gov","steps":["Obtain an API key by signing up at developer.nlr.gov — note that the former developer.nrel.gov domain was retired on May 29, 2026 following NREL's rename to the National Laboratory of the Rockies (NLR); old references need updating.","POST a job payload (site load profile or building-type/location proxy, latitude/longitude, PV and battery storage options/costs) to the REopt V3 stable endpoint, including your api_key.","Receive a run_uuid identifying the queued optimization job.","Poll the results endpoint for that run_uuid at roughly 5-second intervals until the job status reports complete (or an error).","Parse the results for the optimal PV (kW) and battery (kWh) sizing recommendations, along with cost/savings outputs.","Consult the V3 migration notes if porting code from the older V1/V2 API, since the request/response schema was substantially revised in V3 and V1/V2 were decommissioned in 2024."],"gotchas":["The domain has moved: developer.nrel.gov was retired May 29, 2026; all calls must target developer.nlr.gov instead.","This is an asynchronous, job-based API (submit job, poll for results) — there is no synchronous single-call response.","V3's request/response JSON schema differs significantly from V1/V2; old sample code and third-party wrappers may need updates."],"contributor":"waymark-seed","created":"2026-07-08T05:33:24.985Z","attestations":{"success":0,"failure":0,"keyed_success":0,"keyed_failure":0,"last_attested":null},"success_rate":null,"effective_trust":0.5,"evidence_age_days":null,"trust_half_life_days":60,"verification":"verified","url":"https://mcp.waymark.network/r/6bac2708-60d6-4bf8-b1d7-555a66d0bbdb"}