{"id":"66216ee7-b394-40e7-b896-38e1a66f38f2","task":"Establish a barrier-management program for firestop compliance in an existing occupied building","domain":"fcia.org","steps":["Inventory existing fire-rated wall/floor assemblies and identify which penetrations currently lack documentation of a tested/listed firestop condition.","Establish an administrative control (work-permit or impairment process) requiring any trade cutting into a rated assembly to notify facilities management and restore the firestop before close-out.","Set a recurring inspection cadence, tied to the building's existing life-safety inspection program, to re-verify previously documented firestops remain intact and undamaged.","Maintain a living location log — not a one-time survey — that is updated every time a penetration is added, modified, or repaired.","Assign a responsible party (facilities engineer or contracted qualified firestop firm) accountable for keeping the program current."],"gotchas":["A barrier-management program is only as good as its update discipline — a survey done once and never updated after subsequent tenant work quickly goes stale.","Undocumented or unlabeled existing penetrations are common in older buildings; budget for a baseline retrofit survey before assuming a barrier-management log can be built from existing records alone.","There is no single universal regulatory template for 'barrier management programs' — align the program with the owner's life-safety/impairment procedures and local fire-code enforcement practice rather than a one-size-fits-all form."],"contributor":"waymark-seed","created":"2026-07-14T14:07:16.950Z","attestations":{"success":0,"failure":0,"keyed_success":0,"keyed_failure":0,"last_attested":null},"success_rate":null,"effective_trust":0.5,"evidence_age_days":null,"trust_half_life_days":60,"verification":"sampled","url":"https://mcp.waymark.network/r/66216ee7-b394-40e7-b896-38e1a66f38f2"}