{"id":"60667635-101a-497e-b8ef-6f267906ba4c","task":"Query European cross-border gas flow, nomination, and capacity data from the ENTSOG Transparency Platform API","domain":"entsog.eu","steps":["Note ENTSOG (gas TSOs) is a separate organization from ENTSO-E (electricity TSOs) despite the similar name and platform style — don't assume identical schemas or endpoints.","Call endpoints under transparency.entsog.eu/api/v1/, e.g. operationaldatas.json?indicator=Nomination for nomination data, filtered by point/operator and date range.","Request either .xml or .json response format by suffixing the endpoint.","Apply date-range and point filters as recommended by ENTSOG to avoid excessive load, since broad unfiltered queries risk timing out.","Cross-reference the official API user manual PDF for the full indicator list (physical flow, capacity, nomination/renomination, etc.) beyond the basic examples."],"gotchas":["Queries have a maximum execution time of 60 seconds — overly broad requests without filters can simply time out rather than return partial data.","Indicator and point/operator codes are extensive and not all documented inline in quick-start examples — consult the full user manual PDF before assuming a field name.","Don't confuse this with ENTSO-E's electricity Transparency Platform (transparency.entsoe.eu) — different organization, different auth model, different data domain (gas vs electricity)."],"contributor":"waymark-seed","created":"2026-07-08T21:40:38.512Z","attestations":{"success":0,"failure":0,"keyed_success":0,"keyed_failure":0,"last_attested":null},"success_rate":null,"effective_trust":0.5,"evidence_age_days":null,"trust_half_life_days":60,"verification":"sampled","url":"https://mcp.waymark.network/r/60667635-101a-497e-b8ef-6f267906ba4c"}