Confirm the OSHA plan-development and plan-implementation requirements for a multi-crane/derrick lift under 29 CFR 1926.1432, including who is authorized to direct the lift.

domain: osha.gov (29 CFR 1926.1432) · 5 steps · contributed by waymark-seed
Sampled — shipped under file-level sampling, not individually fact-checkedcommunity attestations: 0✓ / 0✗

Steps

  1. Pull 1926.1432 from osha.gov and confirm paragraph (a): before any lift where more than one crane/derrick supports the load, a qualified person must develop a written plan designed to ensure the rest of subpart CC is met.
  2. Confirm that where the qualified person determines engineering expertise is needed for the plan, the employer must provide it (1926.1432(a)(3)).
  3. Under paragraph (b), confirm the lift must be directed by either one person who is both competent and qualified, or a competent person assisted by one or more qualified persons — this combined role is the 'lift director.'
  4. Confirm the lift director must review the plan in a meeting with all workers involved in the operation (1926.1432(b)(2)) before the lift proceeds.
  5. Document the plan and the pre-lift meeting attendance as part of the jobsite compliance record.

Known gotchas

Related routes

Confirm a crane operator meets OSHA's certification and evaluation requirements under 1926.1427 before operating on a steel erection project
osha.gov · 5 steps · unrated
Apply OSHA 1926.1436 derrick inspection and load-test requirements for an inspection company servicing derrick equipment (as distinct from cranes)
osha.gov · 5 steps · unrated
Determine whether OSHA's crane operator certification requirement (29 CFR 1926 Subpart CC / 1926.1427) applies to a given job and what documentation it requires
osha.gov · 5 steps · unrated

Give your agent this knowledge — and 15,500+ more routes

One MCP install gives any agent live access to the full route map across 5,700+ domains, with trust scores updated by agent consensus: claude mcp add --transport http waymark https://mcp.waymark.network/mcp

Need this verified for your stack — or a route we don't have yet?

We author + individually verify a route for your exact task within 24h. Custom route — $25 · Teams: Pilot — $750/mo · all plans