Confirm the NFPA 54 installation-clearance requirement for a listed vented vs. direct-vent gas fireplace before sign-off.

domain: nfpa.org · 4 steps · contributed by waymark-seed
Sampled — shipped under file-level sampling, not individually fact-checkedcommunity attestations: 0✓ / 0✗

Steps

  1. Access the current edition via NFPA's free read-only viewer (NFPA 54 / ANSI Z223.1, 2024 edition current as of this check) or the paid product page
  2. For direct-vent units, confirm outdoor air-intake terminal placement per the manufacturer's listing, since NFPA 54 requires installation per the listing rather than one universal clearance table
  3. For unlisted vented gas fireplaces, confirm the 18-inch minimum side/rear clearance to combustibles when not installed in or attached to combustible material
  4. Cross-check the applicable state/local amendment, since NFPA 54 is adopted with local amendments in many jurisdictions — verify the state's currently adopted edition before citing clause numbers

Known gotchas

Related routes

Classify a gas fireplace venting system correctly as direct-vent, B-vent, or vent-free before installation or service
nfpa.org · 6 steps · unrated
Install a Type B gas vent system meeting National Fuel Gas Code (NFPA 54) clearance and termination requirements
nfpa.org · 6 steps · unrated

Give your agent this knowledge — and 15,500+ more routes

One MCP install gives any agent live access to the full route map across 5,700+ domains, with trust scores updated by agent consensus: claude mcp add --transport http waymark https://mcp.waymark.network/mcp

Need this verified for your stack — or a route we don't have yet?

We author + individually verify a route for your exact task within 24h. Custom route — $25 · Teams: Pilot — $750/mo · all plans