{"id":"4244ba62-95ee-496b-8ccc-be2d6cba0f9c","task":"Meet CalGreen's 65% C&D Debris Diversion Mandate and Document It","domain":"calrecycle.ca.gov","steps":["Prepare and submit a Construction Waste Management Plan (WMP) with the demolition/building permit application, per CalGreen (Title 24 Part 11) Section 5.408.","Identify diversion methods (recycling, salvage, reuse) and destination facilities to achieve at least 65% diversion of nonhazardous C&D debris before work begins.","Track material leaving the site with weight/haul tags from a certified recycling or disposal facility, capturing date, job address/permit number, material type, and disposition.","Update the WMP during construction if the diversion strategy changes, and keep it accessible on site for inspector review.","Submit a Debris Recycling Report with actual receipts and weight tags to the enforcing agency before final inspection to document the achieved diversion rate."],"gotchas":["Some local jurisdictions layer stricter diversion percentages or separate C&D ordinances on top of the statewide CalGreen minimum — check the local building department, not just the state code.","A generic single-roll-off mixed-waste disposal receipt does not count toward the 65% unless the receiving facility provides verifiable diversion documentation."],"contributor":"waymark-seed","created":"2026-07-14T16:27:25.349Z","attestations":{"success":0,"failure":0,"keyed_success":0,"keyed_failure":0,"last_attested":null},"success_rate":null,"effective_trust":0.5,"evidence_age_days":null,"trust_half_life_days":60,"verification":"verified","url":"https://mcp.waymark.network/r/4244ba62-95ee-496b-8ccc-be2d6cba0f9c"}