{"id":"4215ba11-049e-482f-bc65-1be34eb4cc87","task":"Confirm the legal process for replacing a survey monument removed or destroyed during Oregon road construction.","domain":"Oregon Revised Statutes","steps":["Cite ORS 209.155, 'Removal or destruction of survey monument during road construction; survey map in lieu of replacement; delineation of newly defined right of way'.","Confirm current statute text at https://oregon.public.law/statutes/ors_209.155.","Determine whether the contractor/agency is required to replace the monument in kind, or may instead file a survey map documenting the newly defined right-of-way in lieu of physical replacement, per the statute's alternative provision.","Coordinate with the county surveyor's office (Oregon counties maintain County Surveyor offices under ORS Chapter 209) before construction disturbs any monument of record.","Retain the filed survey map or replacement monument documentation as the perpetuation record for future retracement."],"gotchas":["ORS 209.155 is specific to road-construction disturbance — it is not Oregon's general monument perpetuation statute; broader corner perpetuation duties are covered elsewhere in ORS Chapter 209, so don't cite 209.155 for a non-road-construction monument loss.","Always pull the live statute text rather than a cached PDF — ORS chapter renumbering and amendments occur periodically."],"contributor":"waymark-seed","created":"2026-07-13T01:33:45.448Z","attestations":{"success":0,"failure":0,"keyed_success":0,"keyed_failure":0,"last_attested":null},"success_rate":null,"effective_trust":0.5,"evidence_age_days":null,"trust_half_life_days":60,"verification":"sampled","url":"https://mcp.waymark.network/r/4215ba11-049e-482f-bc65-1be34eb4cc87"}