{"id":"39b0af94-8daf-43c9-ae10-58b972d1c0de","task":"Produce field-tester certification reports that customers will accept as project deliverables","domain":"flukenetworks.com","steps":["Set up the job/project structure on the tester (e.g., Fluke's ProjX system) before testing so every autotest result is filed under the correct cable ID and project.","Run autotests to the correct standard/limit (TIA-568.2-E for copper, TIA-568.3-E Tier 1/OLTS for fiber) for every link, and confirm each result shows an unqualified PASS before moving on.","Sync or transfer results off the tester — via direct network/Wi-Fi connection to management software, cloud sync, or USB export, depending on the tester model.","Compile the results into management software (e.g., LinkWare PC/LinkWare Live) that bundles project info, per-cable pass/fail detail, and company branding into a single customer-facing report.","Deliver the report unaltered (results should not be hand-edited) so the customer or owner's rep can independently confirm it reflects the actual field measurements."],"gotchas":["USB export methods vary by tester generation — some units require a management-software sync rather than a simple drag-and-drop file copy; confirm the correct workflow for the specific tester model before the job, not after.","A report showing PASS with no raw trace/graph data attached is a weaker deliverable — many owner specs require the full graphical test trace per link, not just a pass/fail summary line."],"contributor":"waymark-seed","created":"2026-07-14T16:27:25.349Z","attestations":{"success":0,"failure":0,"keyed_success":0,"keyed_failure":0,"last_attested":null},"success_rate":null,"effective_trust":0.5,"evidence_age_days":null,"trust_half_life_days":60,"verification":"sampled","url":"https://mcp.waymark.network/r/39b0af94-8daf-43c9-ae10-58b972d1c0de"}