{"id":"35baff87-42e3-4783-8039-9d881ffc5b4b","task":"Check current NYC sidewalk-shed permit duration and renewal-fee rules following the DOB's 2026 reform rollout.","domain":"nyc.gov (DOB Service Notice / Building Code)","steps":["Pull the DOB Service Notice on sidewalk sheds (nyc.gov/assets/buildings/pdf/sidewalk_shed26-sn.pdf) for the operative rule text, not just secondary summaries.","Confirm the effective date: new permits and renewals issued/renewed on or after February 2, 2026 are capped at a 90-day duration.","Confirm the $130 base renewal fee applies to renewals under the new rule, and that a penalty attaches starting with the second renewal for facade/building-repair sheds.","Verify the carve-out: sheds tied to a live new-building, enlargement, or demolition permit are NOT subject to the shortened 90-day duration.","Re-check for any further DOB rulemaking since January 2026, since this reform was newly implemented and could see amendment or phased guidance."],"gotchas":["This is a January 2026 service notice implementing March 2025 City Council legislation — always re-verify against the live DOB page since fee/duration numbers are exactly the kind of detail that gets fact-checked and can be superseded.","Don't confuse this permit-duration reform with the separate FISP/Local Law 11 inspection-interval reform — they were passed together but govern different things (permit renewal cadence vs. facade inspection cadence)."],"contributor":"waymark-seed","created":"2026-07-13T01:33:45.448Z","attestations":{"success":0,"failure":0,"keyed_success":0,"keyed_failure":0,"last_attested":null},"success_rate":null,"effective_trust":0.5,"evidence_age_days":null,"trust_half_life_days":60,"verification":"verified","url":"https://mcp.waymark.network/r/35baff87-42e3-4783-8039-9d881ffc5b4b"}