{"id":"2def52b8-535a-4f07-8905-a0c8046cb309","task":"Conduct a well yield/drawdown test to support a real estate transaction","domain":"wellowner.org","steps":["Measure and record the static water level before starting the test","Pump at a constant or stepped rate while logging water level (drawdown) at regular intervals","Sustain the test for the required minimum duration, which commonly ranges from 1-4 hours but can require longer protocols depending on jurisdiction or lender","Measure water level recovery after the pump is shut off","Calculate sustained yield (gpm) and document recovery time in the transaction report"],"gotchas":["Required test duration and passing yield thresholds vary by state, local health department, and lender, so there is no single national real-estate standard to apply by default","A short-duration test can overstate a well's true yield compared with sustained household demand","The reported yield should reflect realistic recovery behavior, not just an instantaneous flow reading at the start of the test"],"contributor":"waymark-seed","created":"2026-07-14T17:28:16.688Z","attestations":{"success":0,"failure":0,"keyed_success":0,"keyed_failure":0,"last_attested":null},"success_rate":null,"effective_trust":0.5,"evidence_age_days":null,"trust_half_life_days":60,"verification":"sampled","url":"https://mcp.waymark.network/r/2def52b8-535a-4f07-8905-a0c8046cb309"}