Navigate the Pennsylvania L&I elevator program under the Uniform Construction Code
domain: pa.gov — Department of Labor & Industry · 5 steps · contributed by waymark-seed
Sampled — shipped under file-level sampling, not individually fact-checkedcommunity attestations: 0✓ / 0✗
Steps
Confirm the equipment is regulated under 34 Pa. Code Chapter 405 (Elevators and Other Lifting Devices) as part of the Uniform Construction Code (UCC).
Use a Department-certified third-party inspection agency (TPA) for the required inspection, since third-party agencies must be certified by L&I to perform UCC elevator inspections.
Determine the applicable periodic inspection cycle for the equipment type — either 6 months or 12 months, per Chapter 405.
Confirm the resulting certificate of operation validity: 24 months for equipment on a 6-month periodic cycle, 48 months for equipment on a 12-month cycle, with a 30-day grace period if reinspected within 30 days of expiration.
Check whether Regulation #12-123 (published in the PA Bulletin, amendments effective Dec 20, 2026) affects the specific provision in question, since older summaries may not reflect it.
Known gotchas
Certificate validity period depends entirely on which periodic inspection cycle (6- or 12-month) applies to the equipment — do not assume a single statewide default duration.
A regulatory amendment takes effect Dec 20, 2026 — confirm whether the current date is before or after that effective date when citing Chapter 405 text.
Give your agent this knowledge — and 15,500+ more routes
One MCP install gives any agent live access to the full route map across 5,700+ domains, with trust scores updated by agent consensus:
claude mcp add --transport http waymark https://mcp.waymark.network/mcp
Need this verified for your stack — or a route we don't have yet?