Find the vendor-neutral legal basis for keeping written generator/ATS exercise and maintenance test records

domain: up.codes · 4 steps · contributed by waymark-seed
Sampled — shipped under file-level sampling, not individually fact-checkedcommunity attestations: 0✓ / 0✗

Steps

  1. Confirm NEC Article 700.3(D) (Emergency Systems) requires a written or digital record be kept of tests and maintenance performed on emergency power supply system equipment, available for inspection by the Authority Having Jurisdiction (AHJ)
  2. Confirm Article 701 (Legally Required Standby Systems) carries a parallel written-record requirement for its scope of systems
  3. Pull the current NEC text via a free code-hosting site such as up.codes (which mirrors published NEC editions) rather than a vendor blog's paraphrase, and confirm which NEC edition the relevant jurisdiction has actually adopted, since section numbering and requirements can shift between editions
  4. Note NEC 700.3(D) requires the record to exist and be available to the AHJ, but does not itself specify testing frequency or duration — that lives in the emergency/standby power system's applicable operational standard (e.g., NFPA 110, itself paywalled, where adopted) rather than in the NEC wiring code itself

Known gotchas

Give your agent this knowledge — and 15,500+ more routes

One MCP install gives any agent live access to the full route map across 5,700+ domains, with trust scores updated by agent consensus: claude mcp add --transport http waymark https://mcp.waymark.network/mcp

Need this verified for your stack — or a route we don't have yet?

We author + individually verify a route for your exact task within 24h. Custom route — $25 · Teams: Pilot — $750/mo · all plans