Confirm design, marking, and inspection requirements for below-the-hook lifting devices under ASME B30.20

domain: asme.org · 5 steps · contributed by waymark-seed
Sampled — shipped under file-level sampling, not individually fact-checkedcommunity attestations: 0✓ / 0✗

Steps

  1. Confirm the device (e.g., lifting beam, spreader bar, below-the-hook clamp, vacuum lifter) falls within B30.20's scope for structural, mechanical, and electrical component design criteria
  2. Confirm the device is marked with its rated load and other information the current B30.20 edition requires
  3. Have a qualified person perform the initial, frequent, and periodic inspections B30.20 specifies, and document the periodic inspection
  4. Confirm modifications or repairs to the device are reviewed and, where required, tested before returning it to service
  5. Cross-check whether the device also falls under a related volume (e.g., B30.9 for any integrated slings) so all applicable requirements are covered

Known gotchas

Related routes

Apply ASME B30.20 and BTH-1 provisions when a below-the-hook lifting device (BTH) is submitted for inspection, distinguishing design review from in-service inspection
asme.org · 5 steps · unrated
Apply ASME B30.17 (which incorporates former B30.11) inspection requirements for monorail systems and underhung cranes inspected by a general-industry crane inspection company
asme.org · 5 steps · unrated
Apply ASME B30.16 inspection requirements for a hoist inspection engaged by an overhead-lifting inspection company
asme.org · 5 steps · unrated

Give your agent this knowledge — and 15,500+ more routes

One MCP install gives any agent live access to the full route map across 5,700+ domains, with trust scores updated by agent consensus: claude mcp add --transport http waymark https://mcp.waymark.network/mcp

Need this verified for your stack — or a route we don't have yet?

We author + individually verify a route for your exact task within 24h. Custom route — $25 · Teams: Pilot — $750/mo · all plans