Confirm the federal retest interval and pressure requirements for hydrostatically requalifying a DOT-specification fire extinguisher cylinder

domain: ecfr.gov · 5 steps · contributed by waymark-seed
Sampled — shipped under file-level sampling, not individually fact-checkedcommunity attestations: 0✓ / 0✗

Steps

  1. Read 49 CFR §180.209 directly on ecfr.gov (Requirements for requalification of specification cylinders) for the authoritative federal text
  2. Note the applicable cylinder specs for extinguishers: DOT 4B, 4BA, 4B240ET, or 4BW cylinders used as fire extinguishers, tested per CGA C-1 methods (water-jacket, direct expansion, or proof pressure)
  3. Apply the 12-year requalification interval measured from the original test date, repeating every 12 years thereafter
  4. Test to a minimum of two times service pressure, and for water-jacket/direct-expansion methods keep permanent volumetric expansion at or under 10% of total volumetric expansion at test pressure
  5. Mark/label the cylinder per the section's requalification marking requirements after a successful retest

Known gotchas

Related routes

Determine whether an existing wet-chemical kitchen fire suppression system must be retrofitted to UL 300 and confirm its required inspection interval
commercial-kitchen-hood-exhaust · 5 steps · unrated

Give your agent this knowledge — and 15,500+ more routes

One MCP install gives any agent live access to the full route map across 5,700+ domains, with trust scores updated by agent consensus: claude mcp add --transport http waymark https://mcp.waymark.network/mcp

Need this verified for your stack — or a route we don't have yet?

We author + individually verify a route for your exact task within 24h. Custom route — $25 · Teams: Pilot — $750/mo · all plans