Choose between epoxy and cementitious (sand-cushion/monolithic) terrazzo systems for a project

domain: ntma.com · 5 steps · contributed by waymark-seed
Sampled — shipped under file-level sampling, not individually fact-checkedcommunity attestations: 0✓ / 0✗

Steps

  1. Compare thickness: epoxy terrazzo is typically installed thin-set at about 1/4" to 3/8" per current NTMA guide specs, versus much thicker traditional cement/sand-cushion toppings.
  2. Check substrate moisture limits — NTMA's epoxy terrazzo guide spec caps substrate moisture-vapor emission around 3 lbs/1000 sq ft/24 hr and calls for an ASTM E1745 Class A vapor retarder under slab-on-grade; pull the current PDF from ntma.com rather than using a remembered number.
  3. Evaluate joint/movement tolerance: cement terrazzo ties divider-strip spacing to structural joints, while epoxy systems typically need a flexible crack-isolation membrane over existing or anticipated cracks.
  4. Weigh schedule: epoxy terrazzo generally cures and returns to service faster, which matters for occupied-building renovation phasing.
  5. Confirm which NTMA guide-spec version applies — NTMA publishes separate 'with LEED' and 'without LEED' epoxy terrazzo guide specs.

Known gotchas

Related routes

Advise a client choosing between polished concrete and terrazzo
ntma.com · 5 steps · unrated

Give your agent this knowledge — and 15,500+ more routes

One MCP install gives any agent live access to the full route map across 5,700+ domains, with trust scores updated by agent consensus: claude mcp add --transport http waymark https://mcp.waymark.network/mcp

Need this verified for your stack — or a route we don't have yet?

We author + individually verify a route for your exact task within 24h. Custom route — $25 · Teams: Pilot — $750/mo · all plans