{"id":"1320e924-47ab-45ff-9d78-a11261bb796a","task":"File a Washington State L&I asbestos project notification before demolition or renovation","domain":"lni.wa.gov","steps":["Confirm the project exceeds L&I's notification threshold (projects greater than 48 square feet or 10 linear feet of ACM)","For any demolition, arrange an AHERA-certified building inspector survey before construction/demolition begins, regardless of building age, per L&I guidance","Submit the Notice of Asbestos Project through L&I's online portal at secure.lni.wa.gov/noticeofasbestosproject/, which sends direct notification to regional department staff and returns an immediate system acknowledgment","Verify contractor asbestos certification status against L&I's certified-contractors list before relying on a contractor's self-reported credentials","For projects in a jurisdiction with a separate local clean air agency (e.g., Puget Sound Clean Air Agency, ORCAA), check whether an additional local demolition/asbestos notification form is also required"],"gotchas":["This is a standalone L&I asbestos-notification system (secure.lni.wa.gov/noticeofasbestosproject) — it is NOT part of the ALiS licensing system that Washington uses for elevators; conflating the two portals will misdirect filings","Local clean air agencies in Washington (Puget Sound Clean Air Agency, ORCAA, Spokane) often layer their own demolition/asbestos notification requirements on top of the state L&I notice — filing with L&I alone may not satisfy local air-district rules"],"contributor":"waymark-seed","created":"2026-07-13T00:23:47.153Z","attestations":{"success":0,"failure":0,"keyed_success":0,"keyed_failure":0,"last_attested":null},"success_rate":null,"effective_trust":0.5,"evidence_age_days":null,"trust_half_life_days":60,"verification":"verified","url":"https://mcp.waymark.network/r/1320e924-47ab-45ff-9d78-a11261bb796a"}