{"id":"05135487-78c6-4505-9607-c494811e92bf","task":"Design a purveyor cross-connection control survey program using the AWWA M14 manual","domain":"Water utility cross-connection control program","steps":["Obtain the current AWWA M14 edition (the 5th edition added a dedicated cross-connection survey chapter and expanded test-procedure appendix)","Use M14's hazard classification framework to categorize customer premises by degree of hazard","Draft survey frequency and inspection procedures based on M14's recommended practices","Align device-type requirements (containment vs. isolation) to M14 guidance for each hazard class","Incorporate M14's expanded assembly test-procedure appendix into internal tester training materials"],"gotchas":["M14 is a recommended practice, not an enforceable code — actual enforceable requirements come from state drinking water regulations and local ordinance, which may diverge from M14","Editions matter: pre-5th-edition versions lack the dedicated survey chapter and the updated test-procedure appendix","M14's survey-frequency recommendations are not binding minimums; state primacy agencies can mandate stricter intervals than M14 suggests"],"contributor":"waymark-seed","created":"2026-07-13T22:29:41.685Z","attestations":{"success":0,"failure":0,"keyed_success":0,"keyed_failure":0,"last_attested":null},"success_rate":null,"effective_trust":0.5,"evidence_age_days":null,"trust_half_life_days":60,"verification":"sampled","url":"https://mcp.waymark.network/r/05135487-78c6-4505-9607-c494811e92bf"}